Thomas the Tank Engine Wikia
No edit summary
No edit summary
Line 1: Line 1:
  +
{{Infobox Railway
[[File:TalyllynRailwaycrest.jpg|thumb]]
 
  +
|title1=Talyllyn Railway
'''The Talyllyn Railway''' ('''Rheilffordd Talyllyn''') is a narrow gauge preserved railway in Wales running for 7.25mi from Tywyn on the Mid-Wales coast to Nant Gwernol near the village of Abergynolwyn. The line was opened in 1866 to carry slate from the quarries at Bryn Eglwys to Tywyn, and was the first narrow gauge railway in Britain authorised by Act of Parliament to carry passengers using steam haulage. Despite severe under-investment the line remained open, and in 1951 it became the first railway in the world to be preserved as a heritage railway by volunteers.
 
  +
|image1=DuckandDukesRS7.png
  +
|caption1=
  +
|locale=Wales
  +
|terminus=Tywyn Wharf
  +
|stations=4 <small>(''8 halts'')</small>
  +
|built_by=
  +
|controller=
  +
|gauge=2'3" <small>(''686 mm, narrow gauge'')</small>
  +
|year_opened=1866
  +
|year_closed=
  +
|image2=
  +
|caption2=
  +
}}The '''Talyllyn Railway''' (Welsh: ''Rheilffordd Talyllyn'') is a preserved narrow gauge railway line in Tywyn, Wales. Originally starting off as a line to bring down slate from the quarries at Bryn Eglwys to Tywyn, the Talyllyn Railway has evolved into a full-fledged tourist attraction,
   
  +
The railway served as the inspiration for the [[Skarloey Railway]] in [[The Railway Series|the ''Railway Series'']]. A few of the locomotives as well as the railway itself have made appearances in the books, and the line hosts special "Duncan Days" events that see the locomotives
Since preservation, the railway has operated as a tourist attraction, expanding its rolling stock through acquisition and an engineering programme to build new locomotives and carriages. In 1976, an extension was opened along the former mineral line from Abergynolwyn to the new station at Nant Gwernol. In 2001, the preservation society celebrated its 50th anniversary, and in 2005 a major rebuilding and extension of Tywyn Wharf station took place, including a much-expanded facility for the Narrow Gauge Railway Museum.
 
 
The fictional [[Skarloey Railway]], which formed part of the [[Railway Series]] of children's books by the [[Reverend W. Awdry]], was based on the Talyllyn Railway. The preservation of the line inspired the Ealing Comedy film "The Titfield Thunderbolt".
 
 
==Name and gauge==
 
The origin of the railway's name is uncertain: it may refer to the parish of Talyllyn, which contains its eastern terminus, or it may come from Tal-y-llyn, a large glacial ribbon lake at the foot of Cadair Idris 3mi further east. The 2ft 3in gauge of the track is unusual, and was shared by only three other public railways in the United Kingdom: the nearby Corris Railway (which predated the Talyllyn), and the subsequent Plynlimon and Hafan Tramway and Campbeltown and Machrihanish Light Railway.
 
   
 
==History==
 
==History==
===Origins and construction: up to 1866===
 
Slate quarrying began in the hills above Tywyn in the 1830s, but although many small quarries and test levels were established, only one major quarry was developed in the region, at Bryn Eglwys, 7mi north east of the town. Underground working began in the early 1840s, and by 1847 the quarry was being worked by local landowner John Pughe. The finished slates were sent by packhorse to the wharf at Pennal, transferred to boats for a river trip to Aberdyfi (also known as Aberdovey), and then finally loaded into seagoing vessels, a complex and expensive transportation arrangement which limited the quarry's output. In 1861 the outbreak of the American Civil War cut off supplies of cotton to the mills of the north west of England and as a result a number of prosperous mill owners looked for new business opportunities to diversify their interests. One such owner was William McConnel of Lancashire who, in 1859, had purchased a house near Dolgellau, north of Tywyn. In January 1864, McConnel formed the Aberdovey Slate Company, which leased the land including Bryn Eglwys from the landowner, Lewis Morris of Machynlleth.
 
 
McConnel set about improving Bryn Eglwys to increase its output and in 1865 his company earmarked money for the construction of a narrow gauge railway connecting the quarry with the port of Aberdyfi. The standard gauge Aberystwyth and Welsh Coast Railway was expanding rapidly from its base at Machynlleth, however, and in 1863 had reached Tywyn, so McConnel decided to build his line from the quarry to Tywyn, as the nearest point where slate could be transferred to the standard gauge railway. This was despite the line's initial isolation from the rest of the system because of difficulties in bridging the estuary of the Afon Dyfi to the south. An Act of Parliament (28 and 29 Vict, cap cccxv) allowing the company to operate passenger trains as a public railway was given Royal Assent on 5 July 1865, and the company appointed James Swinton Spooner as engineer for the construction. He laid out plans for a relatively straight line climbing steadily from Tywyn to the quarry and work quickly got underway. By September 1866 construction had advanced to the point where the Board of Trade inspector Captain Henry Tyler could make an initial inspection and report.
 
 
Tyler's report led to an unusual alteration, as it was discovered that the loading gauge of the line was too small. The internal width of the overbridges was only 9ft 1in, but the railway's passenger carriages were 5ft 3.5in wide, leaving less than 2ft clearance on either side, less than the minimum required clearance of 2ft 6in. To alleviate this problem, McConnel proposed that the doors on one side of each carriage be permanently barred and the track slewed off-centre beneath the bridges to allow adequate clearance at least on the side with doors, which would allow passengers to get out of the carriages if the train stopped underneath a bridge. Tyler agreed to this arrangement, and to this day all carriages on the Talyllyn have doors on one side only, an unusual feature for a public railway which is shared (albeit for different reasons) with the neighbouring Corris Railway. Tyler also required that improvements be made to the railway's first two steam locomotives, as locomotive No.1 suffered from excessive "vertical motion" and No.2 was said to suffer from "horizontal oscillation". No.1 was returned to its manufacturer where a set of trailing wheels was added to reduce the rear overhang, and the springs on No.2 were adjusted and the crank pins shortened to reduce its oscillation.
 
 
Tyler did not approve the opening until his listed improvements were completed. During the first half of 1866, the various changes required were made and construction of the line was finished, and in October 1866 the railway began an unofficial passenger service, despite not being authorised by the Board of Trade. Passengers were carried "at their own risk" and possibly free of charge until the line was officially sanctioned. In November of that year, Tyler returned to Tywyn and re-inspected the railway following which, subject to some further minor improvements, he approved its formal opening for passenger service. The first public passenger timetable was issued in December 1866, and the first purpose-built, steam-worked, narrow gauge public railway in Britain opened for service.
 
 
===Prosperity under McConnel: 1866–1880s===
 
The railway opened with two locomotives, one carriage and several goods vehicles in use and was operated under a "one engine in steam" policy to ensure that two trains could not collide. Initially the working locomotive was housed in a wooden shed at Ty Dwr on the mineral line above Abergynolwyn station, while the main engineering works at Pendre were constructed. The Pendre works opened on 17 February 1867 and from then on trains began working from Pendre instead of Abergynolwyn.
 
 
At the time of the line's opening, stations were provided at Pendre and Abergynolwyn. In 1867, the halt at Rhydyronen opened, followed by Brynglas and Dolgoch in 1873. Some time shortly after the opening of the railway a branch to Abergynolwyn village was provided. A steep incline dropped from the mineral line east of Abergynolwyn station to the village below, where a series of tram lines radiated. Coal, building materials and general goods were delivered down the incline and the contents of the village cesspits were hauled back up for disposal along the lineside.
 
 
The railway used steam locomotives from the start, unlike its neighbour the horse-drawn Corris Railway. The original two engines, although of entirely different design, were both purchased from Fletcher, Jennings & Co. of Whitehaven in Cumbria, and both are still in service, 140 years on, although so many of their parts have been replaced down the years that much of their present-day component metal is not original. The Talyllyn's rare gauge is thought to have been adopted to match that of the Corris Railway, and the line's two original steam locomotives were among the earliest engines built for such a narrow gauge. No.1 [[Talyllyn]] is an 0-4-2ST (saddle tank) and No.2 [[Dolgoch]] is an 0-4-0WT (well tank). The line carried slate from the quarry to the wharf at Tywyn and general goods along its length. Public passenger trains initially ran between Abergynolwyn, Dolgoch and Pendre stations only; quarrymen were carried on unofficial trains that continued on from Abergynolwyn to the foot of the Alltwyllt incline in Nant Gwernol gorge.
 
 
The line operated successfully during its early years, serving the quarry and the local district. By 1880, Bryn Eglwys employed 300&nbsp;workers and was producing 8000 tons of finished slate per year, all shipped via the railway. Passenger traffic was substantial, rising from 11,500 passengers carried in 1867 to over 23,000 (roughly equivalent to 40,000 passenger journeys) in 1877.
 
 
===Declining fortunes: 1880s–1910===
 
From the 1880s onwards the "Grand Tour" was a popular option with tourists. This used charabancs to link the Talyllyn and Corris railways via Tal-y-llyn Lake and Cadair Idris, returning on Cambrian Railways trains. The last two decades of the 19th century saw a decline in the demand for slate and many smaller quarries fell on hard times, including Bryn Eglwys, where by 1890 production had halved to 4000 tons a year. In 1896, production at the Penrhyn Quarry in north Wales, one of the largest producers of slate, was stopped due to labour disputes, resulting in a temporary increase in demand at other quarries. McConnel expanded production at Bryn Eglwys to take advantage of the sudden demand, but only with the aim of maximising profits during the remainder of his lease, which was to expire in 1910. He built new trial levels without proper provision for the removal of overburden and pushed the limits of safe working in the existing chambers. As McConnel's lease drew to its close, there was no prospect of a further lessee coming forward and work began on dismantling the quarry's equipment.
 
 
===Haydn Jones era: 1911–1950===
 
The Bryn Eglwys quarry was the primary employer in the Abergynolwyn district, so its closure caused significant distress. Local landowner Henry Haydn Jones purchased the company in 1910, the same year he was elected the Liberal MP for Merioneth, and reopened the quarry in January 1911. He did not have any capital to invest in the quarry, however, and the first workings reopened were on the "Broad Vein", which yielded relatively hard slate that was less popular and harder to sell. The lack of an available market for this output forced the quarry to switch to extracting softer slate from the "Narrow Vein" but, because Haydn Jones could not afford to open new workings into the Narrow Vein, he resorted to the dangerous practice of narrowing the columns that supported the roofs of the underground chambers. This practice had begun under McConnel's ownership and Haydn Jones continued it throughout his ownership of the quarry. A brief construction boom after the First World War saw production return to around 4000 tons per year.
 
 
The 1920s also saw an upsurge in holiday traffic, as Britain recovered from the war and tourism gained in popularity. The Talyllyn saw summer passenger numbers grow significantly and regularly had to supplement its formal passenger stock with slate wagons fitted with planks as seats. An unusual tourist service offered by the railway was to hire a slate wagon, which would be left at Abergynolwyn. At the end of the day the tourists would return to Tywyn in the wagon, powered by gravity. This service was discontinued in the early 1930s. The additional income from the tourist trade defrayed some of the costs of operating the railway, but never enough for it to make a profit during Haydn Jones' ownership.
 
 
The lease on Bryn Eglwys expired in 1942, but was extended on an annual basis. In 1946 the weakened columns gave way in a significant collapse and the quarry was deemed unsafe and closed immediately. Haydn Jones had promised to continue operating the railway as long as he was alive and so, despite the closure of the quarry, the railway continued to run trains on a shoestring budget. In 1947 the British railway system was nationalised and the Talyllyn was one of the few operating railways not included. The reasons for this are unclear, but it is significant that all official mention of the railway had ceased several decades before and it is likely that the line was simply forgotten by officialdom. Between 1947 and 1949 the railway ran a passenger service two days a week. On 2 July 1950 Haydn Jones died and closure of the railway seemed inevitable, but the line continued to operate for the remainder of the summer season, ending on 6 October.
 
 
==Preservation==
 
===Rescue: 1951–1960===
 
During the Second World War and in the period immediately afterwards several enthusiasts, particularly from the Birmingham area, had become aware of the narrow gauge railways of Wales and there had been suggestions that one of the lines, most probably the [[Ffestiniog Railway]], could be saved. In the summer of 1950, Tom Rolt wrote a letter to the Birmingham Post newspaper suggesting that a rescue of the Talyllyn be undertaken. He received sufficient positive response for a meeting of interested enthusiasts to be held on 11 October 1950 at the Imperial Hotel in Birmingham. Around 70 people attended the meeting and Rolt proposed the formation of a committee to look into the acquisition of the railway. With the support of the meeting, the committee met for the first time on 23 October and immediately entered into negotiation with Haydn Jones' executors.
 
 
The transfer of ownership to the committee was legally complex, but both parties agreed that all shares in the railway company would be transferred from Haydn Jones' estate to a new company called Talyllyn Holdings Ltd., whose board consisted of two directors from the executors and two from the committee. The transfer took place on 8 February 1951, at which point the newly formed Talyllyn Railway Preservation Society effectively took control of the railway. The Society immediately began to publicise its efforts, hoping to raise funds and find further volunteers to help reopen the railway, and by May nearly 650 members had joined the society. The railway re-opened under the control of the Society for the first time on the Whit Monday bank holiday, 14 May 1951, with trains running between Wharf and Rhydyronen stations. Regular trains began to run on 4 June and continued through the summer.
 
 
In the early years of preservation, the line struggled to operate using the original rolling stock. When the line was taken over in 1950 Dolgoch was the only operating locomotive and it was apparent that it was in need of a major overhaul. To enable operations to continue two further steam locomotives, Nos.3 and 4, were purchased from the recently closed Corris Railway in 1951 and named [[Sir Haydn]] and [[Edward Thomas]] respectively. Because both railways were built to the unusual gauge of 2ft 3in it was relatively easy to adapt the Corris locomotives to work on the Talyllyn. No.3 became the first new locomotive to travel on the railway for over 90 years in 1951, but it frequently derailed, and on inspection it turned out that the Talyllyn track was laid approximately half an inch (13mm) wider than the official gauge, a deliberate policy by the old company to accommodate the long wheelbase of Talyllyn. Both Talyllyn and Dolgoch had unusually wide wheel treads that allowed them to stay on the wide-of-gauge track. This problem was eventually cured by relaying the railway to its correct gauge and altering Talyllyn's trailing wheels to allow them to swivel horizontally, shortening the locomotive's fixed wheelbase. No.4 was unserviceable when it arrived, but John Alcock, the chairman of the Hunslet Engine Company, was a member of the Preservation Society and had No.4 overhauled free of charge at his works.
 
 
Another early addition to the locomotive fleet was No.6 [[Douglas (narrow gauge)|Douglas]], donated to the society by the Birmingham engineering firm Abelsons Ltd. This locomotive was built for the depot railway serving RAF Calshot where it worked until 1945, and, after rebuilding from its original 2ft gauge, it entered service in 1954. Through the 1950s the volunteers and staff members of the TRPS rebuilt the line and rescued it from its state of decay, during a period characterised by a "Boy's Own comic spirit of adventure, involving enthusiasm, ingenuity and a fair degree of irresponsibility".
 
 
On 22 May 1957 the BBC produced a live outside broadcast from the railway, during which Wynford Vaughan Thomas and Huw Weldon commentated on a trip from Dolgoch to Abergynolwyn. The publicity from this broadcast drew substantial numbers of visitors to the railway that summer, with more than 57,500 passengers carried, and this increase in revenue in turn enabled the railway to continue to improve its infrastructure and provide tourists with a better experience. The following year locomotive No.1 Talyllyn returned to steam after an extensive overhaul.
 
 
An important development during this period was the establishment of the Narrow Gauge Railway Museum at Tywyn Wharf station. The first exhibit for what was to become the museum was a locomotive donated in 1952 by Guinness from their recently closed St. James's Gate Brewery railway. In 1954 the Preservation Society agreed to start work on a formal museum and exhibits from around the United Kingdom were acquired to form the nucleus of the collection. In 1955 work started on converting the old gunpowder store at Wharf station into a temporary museum building, and in 1956 the first exhibit arrived at Tywyn.
 
 
===Securing the infrastructure: 1960–1969===
 
The 1960s proved to be a decade of consolidation for the Talyllyn. Pendre works underwent several much-needed expansions, adding additional covered storage for carriages and more workshop room. Modern machine tools, along with proper lighting and a new power supply were added. Substantial improvements to Tywyn Wharf station were also made, along with continued relaying and upgrading of the track to Abergynolwyn. Passenger numbers continued to climb after the BBC broadcast of 1957; in 1960, 67,000 passenger journeys were made, increasing to 78,500 in 1964. In response to this growing popularity the railway undertook a programme of new rolling stock construction.
 
 
By the early 1960s Tywyn Wharf station was in need of major improvements. Before preservation, the station had contained only a fan of sidings, which meant that there was no way for the locomotive of an arriving train to run round the carriages. As a result, trains were pushed from behind as far as Pendre, where the locomotive could be moved past the carriages to the front of the train. A loop was installed at Wharf for the first time in August 1952, to avoid having to propel trains to Pendre, but in the winter of 1964/65 a major upgrade of the station was carried out. This improved the track layout and extended the original office building to provide covered accommodation for passengers and a shop.
 
 
As passenger numbers continued to grow during the late 1960s it became clear that further motive power was needed, especially as the rebuilt No.1 was not performing well. The Talyllyn's unusual track gauge and restricted loading gauge meant that it was unlikely that a locomotive could be found that could work on the line unaltered, so in 1969 a 3ft gauge steam locomotive was purchased from the Bord na Mona (Irish Peat Board) with a view to rebuilding it for use on the Talyllyn. This locomotive was unofficially known as Irish Pete, a nod to its original use.
 
 
===Extension to Nant Gwernol: 1969–1980===
 
The preservation society had long held ambitions to extend the railway along the former mineral extension from Abergynolwyn to the foot of the Alltwyllt incline, and as early as 1959 work had begun to trace the owners of the land that the extension traversed. Planning began in the mid-1960s, but construction did not start until 1968 when the winding house for the Abergynolwyn village incline was demolished. To bring the line up to passenger standards some of the curves needed to be eased, and this required blasting work, as the line runs on a narrow ledge on the hillside at this point. The extension and new station at Nant Gwernol were opened on 22 May 1976 by Wynford Vaughan Thomas who drove in the ceremonial "golden spike" to complete the extension. Despite this official opening ceremony, minor work still remained to bring the extension to the standard required to run regular passenger trains, but regular train services began on 29 May 1976.
 
 
Although the extension of the railway was completed in 1976, work in the vicinity continued with the creation of footpaths connecting to the new station. A new footbridge was built crossing the Nant Gwernol gorge and connecting the station with the existing path on the east side of the river. The bridge and paths were opened on 3 May 1980 by Lord Parry, the chairman of the Wales Tourist Board. By the mid-1970s, it had become clear that passenger numbers were no longer increasing. After 1973, the peak year for passengers on the Talyllyn with 186,000 passenger journeys made, numbers were to decline consistently until the 1990s. Preliminary work on the conversion of Irish Pete for use on the Talyllyn, which had begun in the early 1970s, was put on hold in 1975 and the chassis and boiler were put into storage at Pendre.
 
 
===Consolidation: 1980–2001===
 
With passenger numbers falling and the line extended to Nant Gwernol, the railway entered a period of consolidation. By 1987, the boiler on locomotive No. 6 Douglas was life expired and in need of replacement. Consideration was given to reviving the project to build a new locomotive from the components of Irish Pete instead of purchasing a new boiler for Douglas and in early 1988 work recommenced on the rebuilding of the ex-Bord na Mona locomotive. A new design for a 0-4-2 side tank locomotive was prepared by the railway's Chief Engineer John Bate, which reused the chassis and boiler from the locomotive with a new superstructure and the addition of trailing wheels, and the new locomotive, officially named [[Tom Rolt]] after the Preservation Society's first chairman, was put into service on 6 May 1991. During this period further expansions of both Tywyn Wharf and Pendre stations were undertaken and Abergynolwyn station, which had been rebuilt as part of the Nant Gwernol extension in the 1970s, was expanded further to provide an additional attraction at the eastern end of the line.
 
 
One major anomaly remained in the railway's operations: the 1889 Regulation of Railways Act had required, amongst other measures, that all British passenger trains be fitted with continuous brakes. McConnel had secured an exemption for the Talyllyn Railway, on the basis that the low speed of operation meant they were unnecessary and that the cost of compliance would bankrupt the enterprise, but by the end of the 1990s the Railway Inspectorate was insisting that the Talyllyn be brought into compliance with the act, a little over 100 years after it had passed. By 2001, the railway had fitted its entire passenger fleet with the necessary equipment, operated by air brake pumps mounted on the locomotives.
 
 
===New museum: 2001–present===
 
The Preservation Society celebrated its 50th anniversary in 2001, and as part of the year of celebrations a major new project was launched to once more extend and improve facilities at Tywyn Wharf station. For many years the station had been home to semi-permanent buildings housing the Narrow Gauge Railway Museum, but the new plans for the station included the construction of a new two-storey building to house the museum and the extension of the existing station building to house a new cafe and booking office. Work began on the first phase of the project in January 2002. In 2003 the railway received a £682,500 National Lottery (Heritage Lottery) grant towards the £1,170,000 cost of redeveloping Wharf station, and the new station and museum were officially opened by Prince Charles and The Duchess of Cornwall on 13 July 2005. The railway has seen a steady increase in passengers carried since the turn of the millennium, with nearly 95,500 passenger journeys recorded in 2006, although this figure is still only around half the peak figure carried in 1973.
 
 
==Today==
 
The Talyllyn Railway remains a successful and popular tourist attraction. The original 1860s locomotives and passenger stock still run regularly alongside the roster of more modern rolling stock. The railway is promoted as one of The Great Little Trains of Wales, a joint marketing scheme launched in 1970 that encompasses ten narrow gauge railways in the country, mostly found in north and mid Wales. In 2006, nearly 51,000 passengers were carried.
 
 
In 2003 the railway employed 13 full-time staff, plus the equivalent of an extra six part-time staff in the summer and some 350 volunteers.
 
 
===Special events===
 
The railway operates a programme of special events throughout the year. These include the Tom Rolt Steam and Vintage Rally, children's Duncan Days and Tywyn Victorian week. Since 1984 there has been an annual running event called Race the Train, which follows the railway track 7¼ miles (11.8km) from Tywyn to Abergynolwyn and back again. The challenge is for runners to complete the 14½-mile (23.3km) cross country route faster than the train, which takes around 1 hour 45 minutes.
 
 
===Young Members Group===
 
The Young Members Group (YMG) are the members of the Talyllyn Railway Preservation Society between the ages of 14 and 25. On occasions during the peak season, the Talyllyn Railway has held a Young Members Day in which the youngest qualified people available that day run the railway.
 
 
==Route==
 
===Original passenger line===
 
The main terminus of the line is at Tywyn Wharf (originally known as King's Station, after a local landowner), where the railway's administrative headquarters and the Narrow Gauge Railway Museum are located. When the line carried traffic from the quarry, slates were transferred to the Cambrian Railway on the transhipment sidings. Leaving Wharf station, which stands at an elevation of 40ft (12m) above sea level, the line passes immediately under the A493 Machynlleth to Dolgellau road and enters a long cutting that climbs towards Pendre, at a maximum gradient of 1 in 60. On the left (north) side of the cutting there was once a long siding used for gravity shunting of wagons into the sidings at Wharf station. The railway runs through the cutting for about half a mile (800m), before passing under another road bridge and passing the locomotive and carriage sheds and works at Pendre.
 
 
From Pendre, the railway passes over a gated [[Level Crossings|level crossing]] and runs beside an industrial estate before climbing up to Ty Mawr bridge and on to Hendy, the first of five minor halts, which serves the adjacent farm. The railway runs in an approximately north-easterly direction along the Fathew valley, mainly through fields of local farms on the valley floor, although this is where some of the steepest gradients on the line are to be found. The ruling gradient of the line is 1 in 60.
 
 
More local halts follow at Fach Goch, and Cynfal, the latter having a small platform. The section from Cynfal to Rhydyronen was relaid in 1951 using rail purchased from the Corris Railway after the latter line's closure in 1948, and is therefore known informally as the Corris Straight. Rhydyronen, now a request stop, was the first intermediate station built on the line, opening in 1867. A siding at the station was removed in 1957. A short steep climb under a road bridge follows the station, followed by a slight downhill gradient. Unlike the Ffestiniog Railway, the Talyllyn was not designed to be worked as a gravity line, however this is the only downhill section between Pendre and Nant Gwernol. Another minor halt follows at Tynllwynhen, before the passing loop and station at Brynglas.
 
 
Above Brynglas, the line crosses the Cwm Pandy stream and enters a shallow cutting, climbing as it goes. The cutting ends at a road overbridge after which the line runs through open countryside as it starts to ascend the valley side on a ledge. After approximately a quarter of a mile (400m) it enters woodlands west of Dolgoch, climbing steadily, then curves to the south east and crosses the Dolgoch gorge on the Dolgoch viaduct, which carries the line 51ft above the Dolgoch ravine. Dolgoch station is immediately east of the viaduct, situated on a left-hand curve at 187ft above sea level, and is the main intermediate station on the line, being popular with tourists visiting the nearby falls. The railway continues in a north easterly direction, curving through the woods and climbing the valley side. It shortly passes Quarry Siding, where a halt and passing loop are located, as well as a small former shale quarry, the rock from which was used for ballasting on the railway. The line continues its ascent towards Abergynolwyn station, situated on a ledge cut into the hillside.
 
 
===Abergynolwyn to Nant Gwernol===
 
The original terminus of the statutory railway was Abergynolwyn, beyond which the railway continued as a mineral extension, now converted for passenger use. The extension was originally sharply curved, as the line turns south east into the steeply sided Nant Gwernol gorge but these curves were eased when conversion for passenger use took place in 1976. The whole section is within woods, now owned by the Forestry Commission. Shortly after leaving Abergynolwyn station the line reaches Ty Dwr, where the original locomotive shed stood from 1865 until it was demolished after Pendre works opened in 1867, although the slate water tower continued in use into the 1950s.
 
 
About half way along the 0.75mi extension is the site of the Village Incline. From here the line runs into the gorge, high above the river on a narrow ledge, ending at the foot of the first incline leading to the Bryn Eglwys quarry. The original line fanned out into a set of three sidings, used to marshal trains of loaded slate wagons coming down from the quarry and empty wagons waiting to ascend. Nant Gwernol station, the eastern terminus of the line, was built on the site of the sidings.
 
 
The village of Abergynolwyn was built to house the quarrymen of Bryn Eglwys and their families, and to serve the village an incline and short branch were laid from a point about half way along the mineral extension. The winding house for the incline stood on the narrow ledge, with the mineral line passing through it. The two-track incline dropped 150ft (46m) over a distance of 363ft (111m). At its foot, the line crossed the Nant Gwernol on a girder bridge. Immediately after the bridge, short lines branched off to the east from a wagon turntable to the coal yard and smithy of Pandy Farm and west to a writing slate factory (later a carpenter's yard). The main branch then split to form a storage loop, with a further wagon turntable and a longer branch serving the houses and school to the north east. The main branch continued north, crossing the main road then passing between the two main terraces in the village before ending in a turntable and a final short line connecting to the Capel Jerusalem chapel. The village incline was lifted during the early years of preservation, to provide much needed rail to replace the existing track. The winding house was demolished in 1968 to allow realignment of the railway to form the extension to Nant Gwernol.
 
 
===Galltymoelfre Tramway===
 
Until the closure of the quarries in 1946, the line east from Abergynolwyn was worked as a mineral tramway – only slate and goods trains serving Bryn Eglwys ran on this section. The quarry lay about a mile (1.6km) south-east of Nant Gwernol station and 300ft (100m) above it, with a further mineral tramway connecting the quarry with the railway. What is now Nant Gwernol station was the terminus of the Talyllyn Railway proper. Here the line fanned out into a set of sidings where inbound trains were left and outbound slate trains assembled. The sidings were located on a narrow ledge in the side of the Nant Gwernol gorge.
 
 
Rising south-east from the end of the sidings was the 633ft long, double track gravity operated, Alltwyllt incline, from the top of which the Galltymoelfre Tramway ran south-east towards the quarry for about 0.5mi. The tramway was laid in light bridge rail and worked for its entire existence using horses. The tramway ended at the foot of the Cantrybedd Incline, a 440ft long double track, gravity operated incline. This final incline rose to the north edge of Bryn Eglwys quarry, reaching a height of 612ft above sea level.
 
 
==Operation==
 
The line has six steam locomotives for passenger trains and four diesel locomotives, which are primarily used to haul works trains. It is unusual for all steam locomotives to be operable at the same time, as at least one is normally scheduled for overhaul. The railway also owns 23 carriages and vans, including all of the original carriages and the brake van built for the railway.
 
 
The railway is single track, so special measures have to be taken to prevent collisions. Before preservation, the railway operated a "one engine in steam" policy, but with growing passenger numbers it became necessary to install passing loops and a more stringent method of single line control was introduced. The line is worked by tokens, which authorise the driver to enter a single line section, and these are interlocked to prevent more than one token being withdrawn for a section at any one time. A loop is at Pendre, which was used from the opening of the railway for shunting purposes, and further loops were installed at Brynglas in 1953 and Quarry Siding in 1963. When the Nant Gwernol extension opened in 1976, Abergynolwyn also became a passing loop.
 
   
  +
==The Awdry Connection==
Each passing loop is controlled by a small [[Signal Boxes|signal box]], known as a block-post. These house the lever frames that control the points, the token equipment and telephones. The railway has few signals; instead it has stop boards at each loop, and the blockman allows trains to proceed by use of flags. When the block-post is unstaffed, it is the responsibility of the locomotive crew to change the token before proceeding.
 
  +
The Talyllyn Railway has become best known for becoming the inspiration of the Skarloey Railway, a fictional railway featured in the [[Rev. W. Awdry]]'s ''Railway Series''. Awdry visited the line on a family holiday and became a volunteer soon afterwards, working as a guard. Several of the stories he wrote about the Skarloey Railway were based on incidents he experienced at the Talyllyn, and a few of the line's locomotives have made appearances in the books. [[Christopher Awdry|Christopher]], his wife Diana, and their son Richard were also volunteers.
   
  +
In 1983, the Talyllyn Railway painted their No. 3, "Sir Haydn", in the guise of Sir Handel as an attraction for younger visitors. Christopher Awdry wrote this into ''Great Little Engines'', explaining that the railway had "borrowed" Sir Handel for a short time. This became so popular that the railway began their own events called "Duncan Days", which see a few engines donning faces and running as their fictional counterparts.
==In fiction==
 
The Talyllyn Railway is represented in the [[Thomas the Tank Engine]] books as the [[Skarloey Railway]]; most of the fictional locomotives are based on real-life equivalents. The author, Rev. W. Awdry, visited the line on a family holiday in the early days of preservation and became involved as a volunteer soon afterwards. Several of the stories in [[The Railway Series]] come from his real-life experiences at the Talyllyn, and some of the books contain full-page illustrations of Talyllyn locomotives.
 
   
  +
The Narrow Gauge Railway Museum, located at Tywyn Wharf station, also hosts a display of Awdry's study, which was added in tribute of him. The display features many of Awdry's old belongings, such as his desk, typewriter and hundreds of books, and several of his models and his [[Ffarquhar]] layout can also be found here.
The preservation of the Talyllyn Railway by volunteers was the inspiration for the 1953 film "The Titfield Thunderbolt", an Ealing Studios comedy about a group of villagers attempting to run a service on a disused branch line after closure. T. E. B. Clarke, the script writer for the film, had heard about the preservation of the Talyllyn and spent a day on the railway in 1951, and some of the early incidents in preservation were incorporated into the film. In the book "Railway Adventure" Tom Rolt recalled that he had hoped the film might be produced on the Talyllyn, but in the end it was filmed on the recently closed Bristol and North Somerset Railway branch line along the Cam Brook, Somers valley in Somerset.
 
   
==Notes==
+
==Locomotives==
  +
The Talyllyn Railway owns eleven locomotives, six steam and five diesel. Talyllyn, Dolgoch and Douglas have made appearances in the ''Railway Series'', though the other engines have made no appearances. This section only documents the locomotives with Skarloey Railway counterparts.
* The spelling of local place names has changed during the history of the railway; for example Tywyn was generally spelled as "Towyn" until 1975. Modern place name spellings are used throughout this article.
 
* According to the Ordnance Survey, the name of the lake is hyphenated. In the early days of the preservation society, it was decided that the name of the railway would be unhyphenated. This convention has been applied to the railway ever since, and is used throughout this article.
 
   
  +
{|class="wikitable" style="margin-left:15px; width: 85%;"
==The Engines==
 
  +
! width="70px" | Name
<gallery position="center" spacing="small" captionalign="center" bordersize="none">
 
  +
! width="80px" | ''RWS'' counterpart
File:RealTalyllyn.jpg|[[Talyllyn]]
 
  +
! width="20px" | No.
File:Dolgoch2014.jpg|[[Dolgoch]]
 
  +
! width="270px" | Notes
File:SirHaydn.jpg|[[Sir Haydn]]
 
  +
! Photo
File:EdwardThomas.jpg|[[Edward Thomas]]
 
  +
|-
File:Midlander.jpeg|[[Midlander]]
 
  +
|<center>[[Talyllyn]]</center>
File:Douglas(Talyllyn)2.jpg|[[Douglas (narrow gauge)|Douglas]]
 
  +
|<center>[[Skarloey]]</center>
File:TomRolt.jpg|[[Tom Rolt]]
 
  +
|<center>1</center>
File:Alf2014.jpg|[[Alf]]
 
  +
|Originally built as an 0-4-0ST with no cab. The locomotive is named after the railway itself.
</gallery>
 
  +
|[[File:TalyllynRed.jpg|140px|center]]
  +
|-
  +
|<center>[[Dolgoch]]</center>
  +
|<center>[[Rheneas]]</center>
  +
|<center>2</center>
  +
|Originally built without a cab. The locomotive is named after the intermediate station and local waterfalls.
  +
|[[File:DolgochRed.jpg|140px|center]]
  +
|-
  +
|<center>Sir Haydn</center>
  +
|<center>[[Sir Handel]]</center>
  +
|<center>3</center>
  +
|Ex-Corris Railway locomotive bought in 1951. The locomotive is named after Sir Haydn Jones, owner of the railway prior to preservation.
 
|[[File:SirHaydn.jpg|140px|center]]
  +
|-
  +
|<center>Edward Thomas</center>
  +
|<center>[[Peter Sam]]</center>
  +
|<center>4</center>
  +
|Ex-Corris Railway locomotive bought in 1951. The locomotive is named after the former manager of the railway. It was fitted with a Giesl ejector between 1958 and 1969.
 
|[[File:EdwardThomas.jpg|140px|center]]
  +
|-
  +
|<center>Midlander</center>
  +
|<center>[[Rusty]]</center>
  +
|<center>5</center>
  +
|Ruston & Hornsby diesel locomotive purchased in 1957 from Jee's quarries at Hartshill. It was named after after the Midlands area group of the preservation society that donated the locomotive.
 
|[[File:Midlander.jpg|140px|center]]
  +
|-
 
|<center>[[Douglas (narrow gauge)|Douglas]]</center>
  +
|<center>[[Duncan]]</center>
  +
|<center>6</center>
  +
|Former RAF Calshot locomotive donated to the Talyllyn Railway in 1958 and regauged from 2ft to 2'3". It is named after Douglas Abelson, who donated the locomotive.
  +
|[[File:DouglasTR2015.jpg|140px|center]]
  +
|-
  +
|<center>Tom Rolt</center>
  +
|<center>[[Ivo Hugh]]</center>
  +
|<center>7</center>
  +
|Built using components from a Bord na Móna (Irish Peat Board) Andrew Barclay locomotive. It is named after L.C.T. Rolt, one of the founders of the Talyllyn Railway Preservation Society.
 
|[[File:TomRolt.jpg|140px|center]]
  +
|-
  +
|<center>Alf</center>
  +
|<center>[[Fred]]</center>
  +
|<center>9</center>
  +
|Ex-National Coal Board diesel locomotive from Huncoat colliery in Lancashire. It was named after Alf Robens, chairman of the National Coal Board.
 
|[[File:Alf2014.jpg|140px|center]]
  +
|-
  +
|<center>Toby</center>
  +
|<center>[[Mark V]]</center>
  +
|
  +
|Small trolley used by engineers for transportation to worksites. Built from a second hand Austin 7 engine and gearbox, mounted on a custom-made chassis.
  +
|[[File:MarkV'sBasis.jpg|140px|center]]
  +
|}
   
==Other==
+
==Appearances==
  +
<tabber>The Railway Series=
<gallery position="center" spacing="small" captionalign="center" bordersize="none">
 
  +
'''[[The Railway Series]]'''
File:TalyllynRWYAdvertisment.jpeg|Advertisment with Sir Handel
 
  +
* [[The Little Old Engine]]
</gallery>
 
  +
* [[Very Old Engines]]
  +
* [[Great Little Engines]]
  +
* [[New Little Engine]]
  +
|-|Other Media=
  +
'''[[Annuals]]'''
  +
</tabber>
   
==External link==
+
==External Links==
* [http://www.talyllyn.co.uk/ The Talyllyn Railway's official website]
+
* [http://www.talyllyn.co.uk/home Official Website]
  +
* [https://en.wikipedia.org/wiki/Talyllyn_Railway Wikipedia]
* [https://twitter.com/TalyllynRailway The Talyllyn Railway's official Twitter]
+
* [https://twitter.com/TalyllynRailway Twitter]
* [[Wikipedia:Talyllyn Railway|The Talyllyn Railway's Wikipedia page]]
 
   
 
{{The Mainland}}
 
{{The Mainland}}

Revision as of 22:08, 17 October 2017

The Talyllyn Railway (Welsh: Rheilffordd Talyllyn) is a preserved narrow gauge railway line in Tywyn, Wales. Originally starting off as a line to bring down slate from the quarries at Bryn Eglwys to Tywyn, the Talyllyn Railway has evolved into a full-fledged tourist attraction,

The railway served as the inspiration for the Skarloey Railway in the Railway Series. A few of the locomotives as well as the railway itself have made appearances in the books, and the line hosts special "Duncan Days" events that see the locomotives

History

The Awdry Connection

The Talyllyn Railway has become best known for becoming the inspiration of the Skarloey Railway, a fictional railway featured in the Rev. W. Awdry's Railway Series. Awdry visited the line on a family holiday and became a volunteer soon afterwards, working as a guard. Several of the stories he wrote about the Skarloey Railway were based on incidents he experienced at the Talyllyn, and a few of the line's locomotives have made appearances in the books. Christopher, his wife Diana, and their son Richard were also volunteers.

In 1983, the Talyllyn Railway painted their No. 3, "Sir Haydn", in the guise of Sir Handel as an attraction for younger visitors. Christopher Awdry wrote this into Great Little Engines, explaining that the railway had "borrowed" Sir Handel for a short time. This became so popular that the railway began their own events called "Duncan Days", which see a few engines donning faces and running as their fictional counterparts.

The Narrow Gauge Railway Museum, located at Tywyn Wharf station, also hosts a display of Awdry's study, which was added in tribute of him. The display features many of Awdry's old belongings, such as his desk, typewriter and hundreds of books, and several of his models and his Ffarquhar layout can also be found here.

Locomotives

The Talyllyn Railway owns eleven locomotives, six steam and five diesel. Talyllyn, Dolgoch and Douglas have made appearances in the Railway Series, though the other engines have made no appearances. This section only documents the locomotives with Skarloey Railway counterparts.

Name RWS counterpart No. Notes Photo
Talyllyn
Skarloey
1
Originally built as an 0-4-0ST with no cab. The locomotive is named after the railway itself.
TalyllynRed
Dolgoch
Rheneas
2
Originally built without a cab. The locomotive is named after the intermediate station and local waterfalls.
DolgochRed
Sir Haydn
Sir Handel
3
Ex-Corris Railway locomotive bought in 1951. The locomotive is named after Sir Haydn Jones, owner of the railway prior to preservation.
SirHaydn
Edward Thomas
Peter Sam
4
Ex-Corris Railway locomotive bought in 1951. The locomotive is named after the former manager of the railway. It was fitted with a Giesl ejector between 1958 and 1969.
EdwardThomas
Midlander
Rusty
5
Ruston & Hornsby diesel locomotive purchased in 1957 from Jee's quarries at Hartshill. It was named after after the Midlands area group of the preservation society that donated the locomotive.
Midlander
Douglas
Duncan
6
Former RAF Calshot locomotive donated to the Talyllyn Railway in 1958 and regauged from 2ft to 2'3". It is named after Douglas Abelson, who donated the locomotive.
Tom Rolt
Ivo Hugh
7
Built using components from a Bord na Móna (Irish Peat Board) Andrew Barclay locomotive. It is named after L.C.T. Rolt, one of the founders of the Talyllyn Railway Preservation Society.
TomRolt
Alf
Fred
9
Ex-National Coal Board diesel locomotive from Huncoat colliery in Lancashire. It was named after Alf Robens, chairman of the National Coal Board.
Alf2014
Toby
Mark V
Small trolley used by engineers for transportation to worksites. Built from a second hand Austin 7 engine and gearbox, mounted on a custom-made chassis.
MarkV'sBasis

Appearances

External Links


* RWS only | ** T&F only